Gallery > Simulated Chart Types

  • Mini Stacked Bar
    Demonstrates a single floating full stacked bar with legend.
  • Dashboard Linear Gauge
    Create a dashboard like chart.
  • Combo With Pie
    Demonstrates generating a sum pie chart image and inserting it into the legend.
  • ComboWithPie2d
    Demonstrates generating a sum pie chart image and inserting it into the legend.
  • Dashboard Linear Gauge 2
    Create a dashboard like chart.
  • Funnel Area
    Create a funnel chart.
  • Progress Bar
    Demonstrates a simple progress bar with percent complete indicator.
  • Pyramid
    Demonstrates a pyramid chart types created using 2 chart areas.
  • Pareto
    How create a pareto chart.
  • Box And Whisker
    Demonstrates how a box and whisker chart is constructed.
  • Step Line
    Demonstrates how a step line can be created from a normal line.
  • Odd Shape Columns
    Demonstrates using AreaLine series to draw arbitrary rectangles anywhere on a chart. These can be used as 2D axis markers or elements to display data.
  • Pie Sum Ring
    Demonstrates using a stacked pie ring to indicate which pie elements belong to which series or group.
  • GDPBubble Pie
    Demonstrates stacked pies using DefaultElement.BubbleSize to control the pie sizes.
  • On Off Chart
    Demonstrates how to set up a timeline during which a machine is shown to be on or off.
  • Compare Scores
    Demonstrates using a score comparison chart.
  • Time Line
    Demonstrates how to create a timeline chart.
  • Waterfall
    Demonstrates how to construct a waterfall chart.
  • Ping Chart
    Demonstrates a custom chart type showing ping response times using sub values.
  • Stacked Time Scale
    Demonstrates a chart with a stacked time scale.
  • Heat Map Grid
    Demonstrates how to create a HeatMap grid using the combo chart type and element markers.
  • Styled Blue
    Demonstrates styling a blue chart.
  • Styled Clean
    Demonstrates advanced styling to create a different chart look.
  • Styled Gantt
    Demonstrates using advanced styling to create a nice gantt chart with additional info.
  • Styled Tanks
    Demonstrates advanced styling to create a chart representing tank levels.